machine equipment appear sufficiently handle required Packing slips shippers Prototype Supplier Survey



Prototype Supplier Survey

 
 

      Company:  _________________________________          Date of Survey:  __________________ 
 

      ____Initial Survey      _____Re-Survey       Previous Survey Date_________ Previous Score _____  
 

      Supplier Code: ___________                                Manufacturing Duns: ___________________

            Manufacturing Duns # _____________________________    

 
 

Manufacturing Facility: (Questions in bold should have documentation to prove it.)

 
 

1.  Is the shop area neat and well organized?       Yes   No 2

 
 

2.  Does the shop area appear to be well lit?       Yes   No 2

 
 

3.  Does the shop area appear to be of adequate size for manufacturing, storage,   Yes   No 2 Quality Control, etc.?        

 
 

Equipment:

 
 

4.  Does equipment appear to be operational and capable of producing quality parts?  Yes   No 3

 
 

  1. Are there preventive maintenance schedules followed and documented for each   Yes   No 3

    machine?          

 
 

  1. Does equipment appear to be able to sufficiently handle the required capacity   Yes   No 3

    and lead-time?        

 
 

    Organization:

 
 

    7.  Does supplier have an organizational chart with names and titles?    Yes   No 2

 
 

    8.  Does supplier have a Manufacturing Manager?      Yes   No 3

 
 

    9.  Does supplier have a Quality Manager?       Yes   No 3

 
 

    10. Can supplier identify the Quality Liaison?       Yes   No 3

 
 

    11. Does supplier have a written policy approved by management for    Yes   No 3

          management responsibilities?       

 
 

    Systems:

 
 

    12. Does supplier have a process for tracking jobs in progress?    Yes   No 2

 
 

    13. Does supplier have a process for controlling engineering changes?   Yes   No 2

 
 

    14. Can supplier demonstrate a good record keeping system in the following areas?

     (a) Jobs on quote          Yes   No 1

       (b) Job in progress (current status)        Yes   No  1

       (c) Inspection (reports, drawings, tape media, GP-11)     Yes   No 1

       (d) Rejected material         Yes   No 1

       (e) Subcontracted jobs         Yes   No 1

       (f) Packing slips (shippers)         Yes   No 1

 
 

Prototype Supplier Survey

Systems: (Cont)

 
 

15. Does supplier have in-house Computer Aided Design (CAD)     Yes   No 2

      capabilities and the qualified personnel to support it?     

 
 

16. Does Supplier have an in-house UG (Unigrapics) workstation?    Yes   No 3

      (a) Is there an electronic means to receive Math Data?      Yes   No 2

 
 

Procedures:

 
 

17. Does supplier have a written procedure for:

            (a) Safety          Yes   No 2

            (b) Operating          Yes   No 2

    (c) Quality control         Yes   No 2

 
 

Employee Development:

 
 

18. Does supplier have employees with journeyman (8 plus years experience)   Yes   No 3

       status?          

 
 

19. Is there a documented training program that:

            (a) Includes all employees?        Yes   No 2

            (b) List who has been trained?        Yes   No 2

            (c) Provide a training schedule?       Yes   No 2

 
 

20. Is there a written performance rating system for employees?    Yes   No 1

 
 

Quality Control:

 
 

21. Does supplier have a separate Quality Control (Inspection Department)?   Yes   No 3

 
 

22. Is the supplier’s Quality Control area:

            (a) Of adequate size?         Yes   No  1

            (b) Properly lighted?         Yes   No 1

            (c) Contain the necessary equipment?       Yes   No 1

            (d) Logistically located to prevent shipment of nonconforming material?   Yes   No 1

 
 

23. Does supplier use a calibration schedule for inspection equipment?   Yes   No 2

 
 

24. Is the inspection and test equipment certified?      Yes   No 3

 
 

25. Does supplier inspect incoming tooling, fixtures, etc.?     Yes   No 2

 
 

26 Does supplier have qualified inspection personnel:

            (a) Trained in geometric tolerance?       Yes   No 2

            (b) Journey status or certified inspector?       Yes   No 2

 
 

27. Is rejected material properly marked and kept separate from approved material?  Yes   No 3

 
 

28. Is there a lockable holding area for rejected parts?      Yes   No 1

 
 

29. Does the supplier have access to the web?       Yes   No 2

 
 

30. Does the supplier utilize the Isuzu Purchasing Web Site?     Yes   No 2

 
 

Prototype Supplier Survey

Subcontracted Operations:

 
 

31. Are subcontracted operations (Tier II) inspected and documented before   Yes   No 2

       further processing?         

 
 

32. Has supplier demonstrated an evaluation system for subcontracted (Tier II)  Yes   No 3

       suppliers?          

 
 

33. Does supplier perform audits or visits of their subcontracted (Tier II) suppliers?  Yes   No 2

 
 

34. Can supplier show attempts to source to minority suppliers?    Yes   No 1

 
 

Quality Certification:

 
 

35. Does the supplier have Quality Certifications (such as QS-9000)?    Yes   No 4

      Name of Certification: _____________________________________________                                                          

 
 

                                                                  Total Points Possible: 100

 
 

                                                                  Actual Rating Points: 

 
 
 
 

Comments:

 
 
 
 
 
 
 

Notification:

Upon completion of the evaluation, the supplier will be informed of specific details in areas needing improvement.  Recommendations will be suggested where appropriate.  Any positive remarks that are part of the evaluation will be acknowledged and the supplier commended.

 
 
 

Recommended Improvements:

 
 
 
 
 
 
 
 

ISUZU Participants:

 
 
 

                                                                      ______________________________________

Purchasing      Engineer

 
 

__________________________________  ______________________________________

Prototype Development Coordinator   Prototype Tooling Representative







"machine equipment appear sufficiently handle required Packing slips shippers Prototype Supplier Survey"
Download links for : << Packing Common fixed expenses machine depreciation Operating income aSee functional based statement >>

How to Download
You may need eMule or Bittorrent to download ebook torrents or emule links.

Report Dead Link
Please leave a comment to report dead links, so that someone else may update new links.


Search More...

[share-ebook]machine equipment appear sufficiently handle required Packing slips shippers Prototype Supplier Survey

Google

Related Books


Books related to :

<< Packing Common fixed expenses machine depreciation Operating income aSee functional based statement

Packaging Deploying Microsoft SharePoint Products Technologies machine a staging environment >>


    machine equipment appear sufficiently handle required Packing slips shippers Prototype Supplier Survey

    Prototype Supplier Survey

     
     

          Company:  _________________________________          Date of Survey:  __________________ 
     

          ____Initial Survey      _____Re-Survey       Previous Survey Date_________ Previous Score _____  
     

          Supplier Code: ___________                                Manufacturing Duns: ___________________

                Manufacturing Duns # _____________________________    

     
     

    Manufacturing Facility: (Questions in bold should have documentation to prove it.)

     
     

    1.  Is the shop area neat and well organized?       Yes   No 2

     
     

    2.  Does the shop area appear to be well lit?       Yes   No 2

     
     

    3.  Does the shop area appear to be of adequate size for manufacturing, storage,   Yes   No 2 Quality Control, etc.?        

     
     

    Equipment:

     
     

    4.  Does equipment appear to be operational and capable of producing quality parts?  Yes   No 3

     
     

    1. Are there preventive maintenance schedules followed and documented for each   Yes   No 3

      machine?          

     
     

    1. Does equipment appear to be able to sufficiently handle the required capacity   Yes   No 3

      and lead-time?        

     
     

      Organization:

     
     

      7.  Does supplier have an organizational chart with names and titles?    Yes   No 2

     
     

      8.  Does supplier have a Manufacturing Manager?      Yes   No 3

     
     

      9.  Does supplier have a Quality Manager?       Yes   No 3

     
     

      10. Can supplier identify the Quality Liaison?       Yes   No 3

     
     

      11. Does supplier have a written policy approved by management for    Yes   No 3

            management responsibilities?       

     
     

      Systems:

     
     

      12. Does supplier have a process for tracking jobs in progress?    Yes   No 2

     
     

      13. Does supplier have a process for controlling engineering changes?   Yes   No 2

     
     

      14. Can supplier demonstrate a good record keeping system in the following areas?

       (a) Jobs on quote          Yes   No 1

         (b) Job in progress (current status)        Yes   No  1

         (c) Inspection (reports, drawings, tape media, GP-11)     Yes   No 1

         (d) Rejected material         Yes   No 1

         (e) Subcontracted jobs         Yes   No 1

         (f) Packing slips (shippers)         Yes   No 1

     
     

    Prototype Supplier Survey

    Systems: (Cont)

     
     

    15. Does supplier have in-house Computer Aided Design (CAD)     Yes   No 2

          capabilities and the qualified personnel to support it?     

     
     

    16. Does Supplier have an in-house UG (Unigrapics) workstation?    Yes   No 3

          (a) Is there an electronic means to receive Math Data?      Yes   No 2

     
     

    Procedures:

     
     

    17. Does supplier have a written procedure for:

                (a) Safety          Yes   No 2

                (b) Operating          Yes   No 2

        (c) Quality control         Yes   No 2

     
     

    Employee Development:

     
     

    18. Does supplier have employees with journeyman (8 plus years experience)   Yes   No 3

           status?          

     
     

    19. Is there a documented training program that:

                (a) Includes all employees?        Yes   No 2

                (b) List who has been trained?        Yes   No 2

                (c) Provide a training schedule?       Yes   No 2

     
     

    20. Is there a written performance rating system for employees?    Yes   No 1

     
     

    Quality Control:

     
     

    21. Does supplier have a separate Quality Control (Inspection Department)?   Yes   No 3

     
     

    22. Is the supplier’s Quality Control area:

                (a) Of adequate size?         Yes   No  1

                (b) Properly lighted?         Yes   No 1

                (c) Contain the necessary equipment?       Yes   No 1

                (d) Logistically located to prevent shipment of nonconforming material?   Yes   No 1

     
     

    23. Does supplier use a calibration schedule for inspection equipment?   Yes   No 2

     
     

    24. Is the inspection and test equipment certified?      Yes   No 3

     
     

    25. Does supplier inspect incoming tooling, fixtures, etc.?     Yes   No 2

     
     

    26 Does supplier have qualified inspection personnel:

                (a) Trained in geometric tolerance?       Yes   No 2

                (b) Journey status or certified inspector?       Yes   No 2

     
     

    27. Is rejected material properly marked and kept separate from approved material?  Yes   No 3

     
     

    28. Is there a lockable holding area for rejected parts?      Yes   No 1

     
     

    29. Does the supplier have access to the web?       Yes   No 2

     
     

    30. Does the supplier utilize the Isuzu Purchasing Web Site?     Yes   No 2

     
     

    Prototype Supplier Survey

    Subcontracted Operations:

     
     

    31. Are subcontracted operations (Tier II) inspected and documented before   Yes   No 2

           further processing?         

     
     

    32. Has supplier demonstrated an evaluation system for subcontracted (Tier II)  Yes   No 3

           suppliers?          

     
     

    33. Does supplier perform audits or visits of their subcontracted (Tier II) suppliers?  Yes   No 2

     
     

    34. Can supplier show attempts to source to minority suppliers?    Yes   No 1

     
     

    Quality Certification:

     
     

    35. Does the supplier have Quality Certifications (such as QS-9000)?    Yes   No 4

          Name of Certification: _____________________________________________                                                          

     
     

                                                                      Total Points Possible: 100

     
     

                                                                      Actual Rating Points: 

     
     
     
     

    Comments:

     
     
     
     
     
     
     

    Notification:

    Upon completion of the evaluation, the supplier will be informed of specific details in areas needing improvement.  Recommendations will be suggested where appropriate.  Any positive remarks that are part of the evaluation will be acknowledged and the supplier commended.

     
     
     

    Recommended Improvements:

     
     
     
     
     
     
     
     

    ISUZU Participants:

     
     
     

                                                                          ______________________________________

    Purchasing      Engineer

     
     

    __________________________________  ______________________________________

    Prototype Development Coordinator   Prototype Tooling Representative